Here's a little trivia while on the subject of NP/SPS. Following is information on a hand written card given to me by NP Pasco Engineer O.W. Berghausen. He carried this card when running east on the SPS.
SCHEDULE FOR Z-6 OR Z-8 5100 CLASS ENGINE WITH 5,000 TONS UP THE HIGH AND DRY (SPS)
Time at west switch of each station straight running time.
Water Capacity: Boiler 27,00 gallons, tank 25,000 gallons, coal 27 tons, add twelve minutes to running time for heading in and getting out flag at meeting points of saw-by. Figure 8,500 gallons water per hour full throttle and 500 gallons each time you head in.
Pasco
23 Martindale
15 Levey
12 Redd
10 Snake River
15 Burr
17 Farrington -- Don't pass Farrington with less than 11,000 gallons water.
27 Kahlotus
10 McAdams
17 Washtucna -- Figure 30 minutes delay for coal, water and air test.
31 Hooper
18 Beng -- Don't pass Beng with less than 13,000 gallons water.
18 Lantz
20 McCall
17 Rockwell
18 Lamont -- Don't run Lamont with less than eleven tons coal and 12,000 gallons water. Figure 30 minutes delay if you take coal water and air test.
26 Rodna
18 Amber
16 Mock
11 Cheney
15 Scribner
Parkwater Terminal -- Beans and bed.
James M. Fredrickson
Mon Sep 6, 1999 12:53 pm
Berg gave me that card as thanks for a photo I had given him of the 5112 at Wymer. NP 5112 was his favorite Z-6. I was introduced to him by Max King while he was a patient at the NP Beneficial Association Hospital in Tacoma. All of this is just about to bring on a few tears. NP had such great people.
* * *
Former SPS vs NP
The SPS had a nearly water level route. BN's argument for choosing SPS to be torn up, as they were determined to eliminate "duplicate" trackage, (almost to the point of being obsessed), was the potential for rockslides and mtce cost of relatively short portion thru Burr Canyon; but if they were so worried about that they should have just rebuilt the UP from Connell over to Burr and eliminated the canyon. Anyway, this "brainstorm move" was regretted almost the moment the dirty job was finished, but what would one expect with the kind of "management" BN had at that particular time (when the decision was made). In earlier times the NP actually ran their eastward trains over the SPS from Pasco to Marshall in order to avoid their Providence Hill, all of the NP crews were qualified to run over the SPS without pilots, and they carried tonnage ratings for SPS line in their time table special instructions. It was a very rude awakening for crews, dispatchers and company officers when they started running trains in both directions over Providence, although many suspected it was not going to work very well. However, when you are using the railroad property and physical plant for a cash cow this is the price that must be paid.
Dave Sprau
Sun Sep 5, 1999 11:14 pm
* * *
Following is part of the text of a Baldwin Locomotive Works ad in Railway Age, June 11, 1938:
In 1934, Baldwin built ten Class A-2, 4-8-4 type locomotives for the Northern Pacific Railway. They rank among the largest and most powerful locomotives of their type and have made a fine record in heavy passenger service.
The success of the A-2 locomotives led to the purchase of eight additional locomotives of similar design which have recently been delivered. Three additional duplicate locomotives burning oil are also being built for the Spokane, Portland and Seattle Railway.
It takes modern locomotives to make money these days!
(These, of course, were NP 2660-2667 (A-3) and SPS 700-702.)
Jim Fredrickson
Mon Sep 13, 1999 10:28 pm
* * *
The Spokane, Portland and Seattle did not run west on NP. The eastwards move over the Spokane, Portland and Seattle was for NP convenience only. If the Spokane, Portland and Seattle tried to run west over the NP, their engines would have fallen down between the rails of the NP track. (Just kidding!) The truth is the Spokane, Portland and Seattle had their own good railway to run over from Pasco to Spokane in both directions and did not need any help from the NP in this regard. If you want to stir this up further, ask me if the Los Angeles and Salt Lake ever had to detour over the Tonopah and Tidewater south of Crucero!
Dave Sprau
Sun Sep 19, 1999 11:57 pm
* * *
NP eastward freight trains ran via Spokane, Portland and Seattle to circumvent the grade up Providence Hill. Eastward passenger trains stayed on the NP.
There was no reason for westbound trains of either road to use other than their own track.
Jim Fredrickson
Mon Sep 20, 1999 12:35 am
* * *
According to the late Wes Beck, a Spokane, Portland and Seattle engineer, the NP detour trains would often run short of water when it was very cold, they would cut off from their train and run light engine to the next water plug.
An eastbound NP Challenger did just that in the Snake River Canyon, they left their train in the siding at Votaw and ran light engine for Washtuctna, they had a meet with an Spokane, Portland and Seattle southbound that Wes was on at Burr.
The NP train was superior, but they lined into the siding figuring it would speed things up if the light engine took siding and let the Spokane, Portland and Seattle freight hold the main. Wes was already there, lining his Challenger into the east end. They met in the middle of the siding on a curve and Wes barely got stopped.