Cabin Creek was listed under First Sub-division commercial spurs in NP employee time tables and for length of track it showed "conn." This was a track into the Boise Cascade logging camp and was on the south side of the eastward main track whereas the Milwaukee was on the north side on the other side of the river.
Boise Cascade loaded out about 30 cars of logs a day for their mill in Yakima. For years local trains would pull the logs and spot the empties in the late afternoon. Then it was decided to have Train Number 640 (out of Auburn about 2 PM do this work. The problem was Number 640 was scheduled out of Yakima at 11 PM with fruit for the east from the Yakima area and on time departure was mandatory. The afternoon chief during this era was a intensely nervous individual and much hand wringing was done worrying about 640 getting the Cabin Creek work done in time to meet the Yakima obligation. Boise Cascade had a lot of clout and would not stand for omission of their switching.
Bottom line -- the connection at Cabin Creek had nothing to do with the Milwaukee and as Dave has said the interchange was at Easton.
In early days their was also an NP/Milwaukee connection near Thorp called Murdock.
It was Cascade Lumber Company before Boise Cascade and the old name of the spur was Hubner.
Jim Fredrickson
Sun Sep 4, 1999
* * *
The reason the old 1950 NPtime tables show "Connection" at Cabin Creek is because their spur at that point once "connected" to the private logging railroad company which went considerable mileage south, back into the woods. There was never a connection between the active Milwaukee Road and the NP or Burlington Northern at Cabin Creek. If you will look in Milwaukee timetables for 1950 or any other year you will not find the station Cabin Creek listed because it did not exist. I was a telegrapher at Easton and later a train dispatcher on this line for the NP and know of what I speak. So I repeat, the place where NP/Milwaukee trans went from one line to another was at Easton interchange track which I described in an earlier post; the trackage that was laid between BN and former Milwaukee at Cabin Creek was an access expedient, done locally in 1982-83 to facilitate removal of Milw rails via a ribbon-rail trains. I was working the Chief Dispatchers job on BN in 1983 when this removal was taking place.
The Milwaukee trackage was not joint with the NP from Cedar Falls. However it was joint NP-Milwaukee from Bagley Junction to Enumclaw, an agreement reached circa 1930 enabling each line to tear out certain portions of track which they both operated seperately up to that time. However this was what was commonly known as the Enumclaw Branch of Milwaukee, and Green River Branch/Buckley Line of the NP; it did not exist for the purpose of being a connection or facilitiating detours between the railroads. Also among the viable arguments for Milwaukee line being preferable to Stampede (academic now of course), lowering the tunnel bed at Snoqualmie was not one of them, as the Milwaukee had already gotten this job done early in the sixties and the Snoqualmie Tunnel was good for any kind of railroad freight "as is."
The correct year for the removal of Milwaukee rail between Hyak and Easton via BN ribbon rail train was 1988, not 1983, need to wear my glasses when checking my notes I guess.
D.T. Sprau
Sun Sep 4-5, 1999 7:52 pm
No comments:
Post a Comment